Four DC chargers installed for Devitech Ltd in Reading, with the supply cabling run from the main panel board through ducts out to the external charging positions.
ClientDevitech Ltd
LocationReading
SectorCommercial
CertificationNICEIC certificate
About the Project
How We Helped
We supplied and installed the cabling, pulled it through, and arranged the shutdown of the client’s distribution board with them so the building lost power only when it suited their operation.
The plant room was tight, which made the containment the awkward part of the job. We worked the routes around what was already there and matched the existing installation, so the new work sits in with it rather than standing out.
Supply and installation of the cabling from the main panel board
Cable pulling through existing and new duct routes
Containment through a tight plant room, matched to the existing installation
Shutdown of the client’s distribution board, planned and arranged with them
Terminations at the board and at each charging position
Installation of 4 DC chargers
Fire stopping where containment passes through the structure
Self managed on site throughout
NICEIC installation certificate supplied upon completion