About the Project
The DC charger sits at the back of the site so the logistics fleet charges overnight and goes out on runs through the day. We installed all the high level containment from the panel board, ran the cable in, fitted the isolator and made the final connections.
At the front of the building we installed four AC chargers for staff car charging. We checked site compliance and issued the electrical certificate for the works. Devitech maintain and monitor the chargers from there, which is what keeps them working years down the line rather than quietly failing.