About the Project
Containment went up first, set out with a laser level and run the full length of the depot wall, then the LV cabling was pulled in and terminated into the charger power cabinets standing on new plinths.
Most of this one was outdoors and the site stayed in use throughout, so the work was staged in sections behind barriers. It took some grinding to get over the line, and the finish is the same standard as the London depot.